Markets. Alternative Project Delivery Methods. Construction Manager At Risk.

Mission View Wash Storm Drain Improvements
Tucson, AZ

Project Info
2008/09
$7.2 M
84% Self-performed
This project includes the installation of approximately 3500 lineal feet of 60” storm drain and all related appurtenances, with approximately 800 lineal feet being installed by jacking and boring. Also included is the excavation of 400,000 cubic yards of material to construct a detention basin with the material being stockpiled onsite.